|
No. |
Name
of the project |
Total
Investment
|
Location |
|
|
|
|
| 1 |
IC
package |
28
million (USD) |
Ningbo |
| 2 |
8"
semiconductor IC chip |
45
million (USD) |
Ningbo |
| 3 |
LED
chip production |
35
million (USD) |
Ningbo |
| 4 |
Videophone |
20
million (USD) |
Ningbo |
| 5 |
Single
crystal silicon and polishing
chip of
IC grade production
|
59
million (USD) |
Ningbo |
| 6 |
Production
of STN-LCD |
69
million (USD) |
Ningbo |
| 7 |
Optical
transmission equipment
production |
27
million (USD) |
Ningbo |
| 8 |
Optical
fiber and optical fiber cable production |
60
million (USD) |
Ningbo |
| 9 |
Lithium
ionic battery production |
33
million (USD) |
Ningbo |
| 10 |
Computerized
SMT Production
System with Annual Capacity
22,000,000 Electronic Board |
15
million (USD) |
Huzhou |
| 11 |
IC
back-end assembly line with
annual capacity of 100 million pieces |
36
million (USD) |
Shaoxing |
| 12 |
To
upgrade the production line of
vacuum fluorescent display(VFD) |
27
million (USD) |
Shaoxing |
| 13 |
Reforming
of large diameter heavily
-doped silicon extended wafer
production line |
30
million (USD) |
Quzhou |
| 14 |
Production
of heatproof enamel-
insulated wire |
6
million (USD) |
Quzhou |
| 15 |
Cable
manufacturing and marketing |
5
million (USD) |
Jinhua |
| |
|
|
|
|
TOTAL
INVESTMENT : |
495
million (USD) |
|